20 photos
Key Specifications
Year
2017
Mileage
54,000 mi
Fuel Type
Diesel
Transmission
Automatic
Body Type
MPV
Colour
SILVER
Standard Features
18in Alloy Wheels - AMG 5-Twin-Spoke Design - Painted Titanium Grey with a High-Sheen Finish
ABS - Anti-Lock Braking System
AMG Bodystyling - Front and Rear Apron and Side Skirts
AMG Floor Mats - Edging in Black and Red Contrast Stitching
ASR - Acceleration Skid Control
ATTENTION Assist - Alerts the Driver to Increasing Fatigue and Inattention
Active Brake Assist with Hold Function - Hill Start Assist - Priming and Dry Braking in the Wet
Active Braking Assist
Air Conditioning - THERMOTRONIC Luxury Automatic Climate Control - Two-Zone
Air Vents with Surround and Cruciform Nozzle in Silver Chrome
Airbag - Kneebag for Driver
Airbags - Driver and Front Passenger
Airbags - Sidebag for Driver and Front Passenger - Combined Thorax-Pelvis Bag
Airbags - Windowbags
Alarm System with Immobiliser and Interior Protection - Thatcham Category 1
Anti-Theft Protection Package
Armrest - Rear - Folding - Including Through-Loading Function and Cup Holder
Audio 20 Radio-CD
Automatic Child Seat Recognition Sensor
Automatic Front Passenger Airbag Deactivation
BAS - Brake Assist with Brake Servo Assistance when Emergency Braking is Detected
Beltline Strips - Chrome
Brake Calipers - Mercedes-Benz Lettering on Front
Braking - Adaptive Brake Lights - Flash Under Emergency Braking
Brushed Stainless Steel Sports Pedals with Rubber Studs
Bumpers - Body-Coloured
Centre Armrest - Front with Stowage
Childproof Locks Rear Doors-Manually Operated and Rear Electric Windows-Electrically Operated
Collapsible Storage Box Stored Under Luggage Compartment Floor
Crash-Responsive Emergency Lighting
Cruise Control with Limiter
Dashboard Trim - Carbon Fibre Look
Direct Select Shift Lever with Steering Wheel Shift Paddles and Cruise Control with Limiter
Door Handles - Body-Coloured
Door Mirrors - Body-Coloured with Integrated LED Indicators and Aspherically Curved Mirror Glass
Door Mirrors - Electrically Adjustable and Heated
Door Sills - Front Door Sills in Aluminium
Door Sills - Front Door Sills with Mercedes-Benz Lettering
Dynamic Select with a Choice of Driving Modes - ECO-Comfort-Sport and Individual
ESP Curve Dynamic Assist
Electric Parking Brake
Electric Windows - 4
Exhaust System - Twin Trapezoidal Tailpipes in Polished Stainless Steel
First Aid Kit and Warning Triangle
Footwell Lighting - Front and Rear
Garmin Map Pilot Navigation System
Glass - Rear Windscreen - Heated with Timer Control
Headlamp Assist - Automatic Headlamp Activation in Dark Conditions
Height-Adjustable Head Restraints - 5
ISOFIX and Top-Tether Child Seat Fixing Points in Rear - Two Outer Seats
Instrument Cluster - Electronic Service Interval Indicator ASSYST
Instrument Cluster - Outside Temperature Display
Instrument Cluster - Upper Control Panel with Galvanised Switches in Silver Chrome
Instrument Cluster - Warning Buzzer and Warning Display if a Seat Belt is not Fastened - Lights Are Left On or Parking Brake is Engaged
Instrument Cluster - Warning Indicators For Fuel-Oil-Coolant-Washer Fluid Levels-Brake Wear
Instrument Cluster with 4.5in TFT Colour Multifunction Display with Silver-Coloured Dials and Red Needles
Interior Lighting - Ambient Lighting Single-Colour with Indirect Illumination of the Interior Door Handles at Front and Rear and Door Trim Elements
Interior Lighting - Courtesy White and Warning Red Lights in the Front Doors and Boot Lid
Interior Lighting - Sun Visor with Illuminated Vanity Mirror for Driver and Front Passenger
Interior Lighting in Rear with Integral Reading Lights and Locator Lighting
KEYLESS-GO Starting Function
Light Switch in High-Gloss Black with Ring in Silver Chrome
Lights - Halogen Headlamps Including Integral LED Daytime Running Lights
Lights - High-Level Third Brake Light - LED Technology
Lights - LED Fibre-Optic Tail Lamps and LED Brake Lights
Media Display - 8in
Media Interface
Mercedes Me Connect - Standard Services
Mirrors - Rear-View Mirror with Additional Lighting
Non-Smoker Package Including 12V Socket and Stowage Compartment in the Front
Parking - Reversing Camera with Dynamic Guidelines on the Media Display
Parking Pilot
Power Steering - Sports Direct-Steer with Speed-Sensitive Servo Assistance and Variable Steering Ratio
Premium Package
Radiator Grille - Two Louvres in Iridium Silver with Chrome Inserts
Rear Seats - Split Folding 1-3 - 2-3 with Cargo Position For Increased Luggage Space
Rear Windscreen Wiper with Intermittent Wipe and Automatic Activation When Reversing
Remote Central Locking
Roof Lining - Black
Seat Belts - Rear Three-Point - 3
Seat Belts Reminder - Front and Rear
Seat Comfort Package
Seat Occupancy Sensor - Front Passenger Seat
Seats - Front Cushion Length Adjustment
Seats - Rear with Fore-Aft Adjustment
Smartphone Integration
Steering Column - Manually Adjustable for Height and Reach
Steering Wheel - 3-Spoke Leather - 12-Button Multi-Function with Flattened Lower Section and Perforated Grip Area and Red Contrast Stitching
Storage Compartment in Centre Console with Retractable Cover
Stowage - Compartments in Front Doors
Stowage - Double Cup Holder in Centre Console
Stowage - Folding Tables on Rear of Driver and Front Passenger Seat Backrests
Stowage - Load-Securing Rings in Luggage Compartment
Stowage - Nets in Front Passenger Footwell
Stowage - Nets on Rear of Driver and Front Passenger Seat Backrests
Stowage - Retractable Load Compartment Cover
Stowage - Sunglasses Compartment in Overhead Control Panel
Suspension - Comfort - Lowered by 20mm Front and 14mm Rear
TIREFIT with Tyre Inflation Compressor
Trip Computer Showing Current Fuel Consumption
Two-Position Luggage Compartment Floor
Tyre Pressure Monitoring System
Wiper System - Windscreen Wipers Including Rain Sensor with Two Sensitivity Stages
eCall - Emergency Call System
All Images (20)
Similar Cars
£10,989
2014 Mercedes E Class
3.5 E400 V6 AMG Line Cabriolet G-Tronic+ Euro 6 (ss) 2dr
68,000 mi
Petrol
View Details
£10,989
2022 Mercedes B Class
1.3 B250e 15.6kWh AMG Line Edition (Premium) 8G-DCT Euro 6 (ss) 5dr
125,000 mi
Petrol Plug-in Hybrid
View Details
£10,989
2019 Mercedes CLA
2.0 CLA220 AMG Line (Premium) Shooting Brake 7G-DCT Euro 6 (ss) 5dr
148,000 mi
Petrol
View Details
For Sale 2017 Mercedes B-Class
2.1 B200d AMG Line (Premium) MPV 5dr Diesel 7G-DCT Euro 6 (ss) (136 ps)
£10,970
Dealer Information
Dace Specialist Car Centre Manchester
718 Liverpool Road, Eccles, Manchester, M30 7LW
0161 697 4321 WhatsApp Dealer Enquire about this vehicle